By using this site, you agree to the Privacy Policy and Terms & Conditions.
Accept
Okay.ngOkay.ngOkay.ng
Font ResizerAa
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Reading: NASA postpones rocket launch to moon after fuel leak
Share
Font ResizerAa
Okay.ngOkay.ng
  • News
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Search
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Follow US
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
© OKN MEDIA PUBLISHING 2022 - All rights reserved
International

NASA postpones rocket launch to moon after fuel leak

Agency Report with Okay.ng
By Agency Report with Okay.ng
Published: September 4, 2022
Share
4 Min Read
NASA’s Artemis I rocket sits on launch pad 39B after the launch was scrubbed at Kennedy Space Center on September 03, 2022 in Cape Canaveral, Florida. Kevin Dietsch/Getty Images/AFP
NASA’s Artemis I rocket sits on launch pad 39B after the launch was scrubbed at Kennedy Space Center on September 03, 2022 in Cape Canaveral, Florida. Kevin Dietsch/Getty Images/AFP
SHARE

NASA on Saturday scrapped a second attempt to get its new 30-story rocket off the ground and send its uncrewed test capsule toward the Moon after engineers detected a fuel leak.

With millions around the globe and hundreds of thousands on nearby beaches waiting for the historic launch of the massive Space Launch System (SLS), a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in.

“The launch director waived off today’s Artemis I launch,” NASA said in a statement. “Multiple troubleshooting efforts to address the area of the leak… did not fix the issue.”

Though the area around the launch site was closed to the public, an estimated 400,000 people had gathered nearby to see — and hear — the most powerful vehicle that NASA has ever launched climb into space.

- Advertisement -

The initial launch attempt on Monday was also halted after engineers detected a fuel leak and a sensor showed that one of the rocket’s four main engines was too hot.

Early Saturday, launch director Charlie Blackwell-Thompson had given the go-ahead to start filling the rocket’s tanks with cryogenic fuel.

About three million liters of ultra-cold liquid hydrogen and oxygen were due to be pumped into the spacecraft, but the process soon hit problems.

No new date for another try was immediately announced.

- Advertisement -

After the latest delay, there are backup opportunities on Monday or Tuesday. After that, the next launch window will not be until September 19, due to the Moon’s position.

The purpose of the Artemis 1 mission is to verify that the Orion capsule, which sits atop the SLS rocket, is safe to carry astronauts in the future.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

Apollo’s twin sister

It will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach. The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule’s heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth’s atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) — roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A government audit estimates the Artemis program’s cost will grow to $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

According to NASA chief Bill Nelson, a crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

Stay Updated on the Go with Our Latest News—Join Our WhatsApp Channel Now!
TAGGED:NASA
SOURCES:AFP
VIA:Okay.ng
Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
Previous Article Just in: Comrade Lawal Faruk emerges new NANS President, to succeed Asefon
Next Article Atiku meets PDP gubernatorial candidates

Connect with Okay on Social

FacebookLike
XFollow
InstagramFollow
TelegramFollow

Dollar/Naira Rates

Okay.ng Logo

Parallel Market Rates

USD
Buy₦1,550.00
Sell₦1,565.00
GBP
Buy₦1,760.00
Sell₦1,790.00
EUR
Buy₦2,135.00
Sell₦2,170.00

Updated: 17 hours ago

Displayed rates are for informational purposes only and are subject to change.

Quick Converter

0.00
ShareShareShare

Rates are for informational purposes only.

Okay.ng Logo Parallel Market Rates
USD
Buy
Sell
GBP
Buy
Sell
EUR
Buy
Sell
| okay.ng
- Advertisement -
- Advertisement -
Ad imageAd image
- Advertisement -
Ad imageAd image

Recent Posts

Elon Musk
Elon Musk Announces America Party Formation, Declares ‘You Shall Have It’
International
Tax Reforms committee
Nigeria’s Tax Reform Journey Continues, Says Committee Chairman Taiwo Oyedele
Economy
MTN Mega Billion Promo: How Nigerians Are Winning Big
Partners
As Nigerian Banks Resume Naira Debit Card International Transactions: Limits You Should Know
News
Former Nigerian Army Chief Advocates for Compulsory Military Training
News
- Advertisement -
Ad imageAd image

You May Also Like

PoliticsTop stories

NNPP Declares Rabiu Kwankwaso Will Not Contest 2027 Presidency on Its Platform

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
July 5, 2025
NSA Nuhu Ribadu
Security

Tinubu Administration Making Headway Against Nigeria’s Security Challenges, NSA Ribadu Affirms

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
July 5, 2025
Politics

Aregbesola Warns ADC Supporters Against Insults, Urges Fact-Based Engagement with APC

Muhammad A. Aliyu
Muhammad A. Aliyu
July 5, 2025
Okay.ngOkay.ng
Follow US
© OKN MEDIA PUBLISHING 2025 - All rights reserved
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?