By using this site, you agree to the Privacy Policy and Terms & Conditions.
Accept
Okay.ngOkay.ngOkay.ng
Font ResizerAa
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Reading: Minister Umahi Clarifies East-West Road Commissioning Amid Criticism
Share
Font ResizerAa
Okay.ngOkay.ng
  • News
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Search
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Follow US
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
© OKN MEDIA PUBLISHING 2022 - All rights reserved
News

Minister Umahi Clarifies East-West Road Commissioning Amid Criticism

Oluwadara Akingbohungbe
By Oluwadara Akingbohungbe
Published: June 13, 2025
Share
3 Min Read
Dave Umahi
Dave Umahi
SHARE

Minister of Works, David Umahi, has addressed recent criticisms regarding the commissioning of the Eleme section of the East-West Road in Rivers State, insisting that detractors lack credibility. During a site inspection on Thursday evening, Umahi explained that the road project is divided into phases and that the section recently commissioned represents phase one, which includes a single carriageway.

He disclosed that the contract for this section was initially awarded at a cost of N156 billion by the former administration, but no construction work began until President Bola Tinubu took office and authorized immediate commencement. Umahi commended the President’s decisive action, calling it a courageous move that has accelerated infrastructure development in the Niger Delta.

The Minister responded specifically to criticisms from Emmanuel Deeyah, President of KAGOTE, an influential Ogoni socio-cultural group representing Khana, Gokana, Tai, and Eleme LGAs. Deeyah had accused Umahi of misleading the President by declaring the road complete when it is still under construction. Umahi countered this by stating, “They must be faceless stakeholders,” and pointed out that even political opponents have praised the project’s progress.

Explaining the phased approach, Umahi said phase one includes one complete carriageway, while phase two will cover the second carriageway, as well as bridges and flyovers. He acknowledged visible gaps on the road where flyover ramps are planned but assured that contractors have been instructed to temporarily asphalt these areas within seven days to ensure a seamless driving experience from Eleme junction to Onne.

- Advertisement -

The Minister lauded the contractor’s efficiency, noting that the first carriageway was completed ahead of schedule by April. He also highlighted plans for advanced 80-span bridges, which will incorporate the latest engineering technologies and are expected to be completed within the next three to five months.

Umahi stressed the strategic significance of the East-West Road, which facilitates access to critical national assets and numerous companies in the region. He explained that the original road design, featuring only 10cm of asphalt, was inadequate for the heavy traffic it supports. The current project involves extensive reconstruction with a one-meter deep foundation, multiple stone layers, and 200mm reinforced concrete pavement, designed to last for at least 50 years.

He concluded by noting the President’s personal concern for the road’s safety record and his commitment to ensuring the project’s successful completion to prevent further accidents.

The Minister is expected to continue his inspection with a visit to the Ahoada-Mbiama section of the East-West Road on Friday.

- Advertisement -

Stay Updated on the Go with Our Latest News—Join Our WhatsApp Channel Now!
TAGGED:David UmahiEast-West RoadInfrastructureKAGOTENiger Delta DevelopmentNigerian roadsOgoni StakeholdersPresident Bola TinubuRivers StateRoad Construction
Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
Previous Article Ondo Governor Dr. Lucky Aiyedatiwa Nominates Ex-AAUA VC Prof. Igbekele Ajibefun and 11 Others as State Commissioners
Next Article Fayemi: Nigeria’s Democracy Still a Work in Progress, Reflects on Radio Kudirat Dangers

Connect with Okay on Social

FacebookLike
XFollow
InstagramFollow
TelegramFollow

Dollar/Naira Rates

Dollar to Naira Exchange Rate

Okay.ng Logo
Buy Rate ₦1,605.00
Sell Rate ₦1,620.00

Last updated: 2 weeks ago (June 3, 2025 2:33 pm)

Displayed rates are for informational purposes only and are subject to change.

USD/NGN Converter

- Advertisement -
- Advertisement -
Ad imageAd image
- Advertisement -
Ad imageAd image

Recent Posts

Halima Buba
EFCC Arraigns SunTrust Bank MD, Executive Director Over Alleged $12m Money Laundering
News
Seun Ogunbambo
EFCC Declares Seun Ogunbambo Wanted Over ₦976.6 Million Oil Subsidy Fraud
News
In-Depth Analysis of Air India Boeing 787 Crash in Ahmedabad
Explainer
My Dad’s Presidency Would Have Changed Nigeria, Abiola’s Son Declares, Reflecting on 1993 Election Annulment
News Top stories
Israel Temporarily Closes Diplomatic Missions Worldwide Amid Military Strikes on Iran
International
- Advertisement -
Ad imageAd image

You May Also Like

Ibrahim Badamasi Babangida (IBB)
NewsTop stories

Lekan Abiola Reveals Babangida’s Private Apology Over Annulled June 12 Election

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
June 13, 2025
Sport

JUST IN: Liverpool Completes £116 Million Signing of Florian Wirtz from Bayer Leverkusen

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
June 13, 2025
News

Fayemi: Nigeria’s Democracy Still a Work in Progress, Reflects on Radio Kudirat Dangers

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
June 13, 2025
Okay.ngOkay.ng
Follow US
© OKN MEDIA PUBLISHING 2025 - All rights reserved
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?