By using this site, you agree to the Privacy Policy and Terms & Conditions.
Accept
Okay.ngOkay.ngOkay.ng
Font ResizerAa
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Reading: FG reopens Third Mainland Bridge
Share
Font ResizerAa
Okay.ngOkay.ng
  • News
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Search
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Follow US
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
© OKN MEDIA PUBLISHING 2022 - All rights reserved
News

FG reopens Third Mainland Bridge

Agency Report with Okay.ng
By Agency Report with Okay.ng
Published: February 1, 2021
Share
3 Min Read
SHARE

The Federal Controller of Works, Lagos, Mr Olukayode Popoola, on Sunday, said that the total shutdown of the Third Mainland Bridge would be lifted at midnight of January 31, 24 hours ahead of schedule.

Popoola told the News Agency of Nigeria on the telephone that the contractor was able to complete the repair works on the bridge on Saturday, hence the lifting of the total closure at midnight.

“The casting of the expansion joints was completed on Saturday. Therefore, the Third Mainland Bridge will be opened by 12 midnight of January 31.

“Motorists can start plying the bridge as from 12 midnight,” he said.

- Advertisement -

While thanking road users for their understanding, Popoola said that the reopening had been communicated to the Lagos State Government and all relevant agencies to ensure seamless traffic on the highway.

NAN recalls that Popoola had, on January 27, announced a three-day total shutdown of the bridge from midnight of Friday to midnight of Monday, February 1 to allow for the replacement of three expansion joints.

The bridge, which is going through series of repairs, was partially shut on July 24, 2020, for another round of rehabilitation works.

The repair, expected to last six months, was extended by one month due to the #EndSARS protests in Lagos, thus extending the completion date from January to February.

- Advertisement -

The construction was initially divided into two phases of three months on each carriageway, starting with the Oworonsoki-bound carriageway whose completion dragged to four months.

Traffic was partially diverted on a stretch of 3.5 kilometres where construction is ongoing between Adeniji Adeniji ramp and Ebute-Meta, while different time belts were allotted for traffic diversions on the bridge.

The 11.8-kilometre bridge is the longest of the three bridges connecting Lagos Island to the Mainland.

The bridge starts from Oworonshoki, which is linked to the Apapa-Oshodi expressway and the Lagos-Ibadan expressway, and ends at the Adeniji Adele interchange on Lagos Island.

Constructed in 1990, the bridge was adjudged the longest in Africa until 1996 when the Oct. 6 Bridge in Cairo, Egypt, was completed.

Stay Updated on the Go with Our Latest News—Join Our WhatsApp Channel Now!
TAGGED:Third Mainland Bridge
Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
Previous Article Premier League: Salah ends goal drought as Liverpool beat West Ham
Next Article Babajide Sanwo-Olu Sanwo-Olu postpones stay-at-home order for civil servants till February 26

Connect with Okay on Social

FacebookLike
XFollow
InstagramFollow
TelegramFollow

Dollar/Naira Rates

Dollar to Naira Exchange Rate

Okay.ng Logo
Buy Rate ₦1,605.00
Sell Rate ₦1,620.00

Last updated: 4 days ago (June 3, 2025 2:33 pm)

Displayed rates are for informational purposes only and are subject to change.

USD/NGN Converter

- Advertisement -
- Advertisement -
Ad imageAd image
- Advertisement -
Ad imageAd image

Recent Posts

NRC Managing Director Warns Against Railway Vandalism: “We Don’t Have Scraps, We Have National Assets”
News
Tragic Head-On Collision in Jigawa Claims Nine Lives, Dozens Injured
News
Victor Osimhen Returns to Nigeria as Al Hilal Transfer Hangs in Balance Ahead of FIFA Club World Cup
Sport
Tinubu Urged by PDP to Cut Fuel and Electricity Costs Amid Eid-el-Kabir Festivities
News
Mike Ejeagha
Mike Ejeagha, Nigerian Highlife Maestro, Dies at 95
News
- Advertisement -
Ad imageAd image

You May Also Like

PoliticsTop stories

Tinubu Welcomes Gov Eno to APC as Political Realignments Intensify Across States

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
June 7, 2025
Sport

Super Eagles Rally to Draw Against Russia in International Friendly

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
June 6, 2025
Sport

Manchester United Raises Annual Core Profit Forecast to Between £180m and £190m After Europa League Boost

Oluwadara Akingbohungbe
Oluwadara Akingbohungbe
June 6, 2025
Okay.ngOkay.ng
Follow US
© OKN MEDIA PUBLISHING 2025 - All rights reserved
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?