By using this site, you agree to the Privacy Policy and Terms & Conditions.
Accept
Okay.ngOkay.ngOkay.ng
Font ResizerAa
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Reading: Abuja Airport Runway Would Be Ready By April 17 – FAAN
Share
Font ResizerAa
Okay.ngOkay.ng
  • News
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Search
  • News
    • Politics
  • Entertainment
  • Business & Economy
  • Sport
  • Tech
Follow US
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
© OKN MEDIA PUBLISHING 2022 - All rights reserved
News

Abuja Airport Runway Would Be Ready By April 17 – FAAN

Farouk Mohammed
By Farouk Mohammed
Published: April 16, 2017
Share
3 Min Read
SHARE

The Managing Director of the Federal Airports Authority of Nigeria (FAAN) has said that the runway of the Nnamdi Azikiwe International Airport, Abuja, would be ready by April 17, two days ahead of the deadline.


 

Engr. Saleh Dunoma gave the assurance in a statement signed by the media consultant to the Minister of State for Aviation, Mr Ariyo Akinfenwa, on Sunday in Lagos.

“We will be ready April 17 but we are leaving the remaining two days for Nigerian Civil Aviation Authority (NCAA).

“We have written to them and they will come by today (Sunday) to do the preliminary inspection.

- Advertisement -

“They have to certify the airport that what we have done is in accordance with their standards.

” If there is any observation as a result of the inspection, we will now make sure we carry out corrections,” the FAAN boss said after inspecting the progress of work at the airport.

He maintained that with the work done, the April 19 deadline for the reopening of the airport is no longer in doubt.

“All the critical items of work are 100 per cent except may be two items; which of course are the markings and the cleaning.

- Advertisement -

“Asphalt work is 100 per cent, markings have reached almost 70 per cent and the airfield lighting system has reached 80 per cent, ” Dunoma added.

According to him, the authority also used the opportunity provided by the closure of the airport to address other Airport Excellence in Safety (APEX) related items.

He said :” We are now levelling all the airfield lightings’ locations, all the installations and flash with the ground surface.

” In case of any skidding, there will not be concrete projection above the ground surface.”

The FAAN boss further explained that the newly constructed runway does not need calibration because the previous Navigational Aids were not tampered with.

“The runway does not need calibration. All we need to check is to make sure there is 100 per cent illumination.

“Calibration is done periodically. When the time come for calibration, the appropriate authority will calibrate the Instrument Landing System (ILS),”he said .

Dunoma also noted that the terminal building was also ready for flight operations.

The Abuja airport was shut on March 8 for six weeks to enable Julius Berger rebuild the 3.6 kilometre runway.

The runway, which was constructed in 1982 was meant to last for 20 years, but had been in use for 35 years without major repairs and maintenance.

Stay Updated on the Go with Our Latest News—Join Our WhatsApp Channel Now!
TAGGED:Abuja AirportFAAN
Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
ByFarouk Mohammed
Publisher
Follow:
Farouk Mohammed is a Head Editor at Okay Nigeria (Okay.ng). He has been publishing for 10 years and focused more on Local/World News on Okay.ng
Previous Article Antonio Conte Wants to Stay at Chelsea For Long
Next Article JW Pepper: James Bond Star, Clifton James Is Dead

Connect with Okay on Social

FacebookLike
XFollow
InstagramFollow
TelegramFollow

Dollar/Naira Rates

Dollar to Naira Exchange Rate

Okay.ng Logo
Buy Rate ₦1,605.00
Sell Rate ₦1,620.00

Last updated: 4 days ago (June 3, 2025 2:33 pm)

Displayed rates are for informational purposes only and are subject to change.

USD/NGN Converter

- Advertisement -
- Advertisement -
Ad imageAd image
- Advertisement -
Ad imageAd image

Recent Posts

Tinubu Urged by PDP to Cut Fuel and Electricity Costs Amid Eid-el-Kabir Festivities
News
Mike Ejeagha
Mike Ejeagha, Nigerian Highlife Maestro, Dies at 95
News
Tinubu Welcomes Gov Eno to APC as Political Realignments Intensify Across States
Politics Top stories
Super Eagles Rally to Draw Against Russia in International Friendly
Sport
Manchester United Raises Annual Core Profit Forecast to Between £180m and £190m After Europa League Boost
Sport
- Advertisement -
Ad imageAd image

You May Also Like

Ange Postecoglou
Sport

Tottenham Hotspur Part Ways with Ange Postecoglou Despite Europa League Glory

Yusuf Abubakar
Yusuf Abubakar
June 6, 2025
News

Dangote Names Main Refinery Access Road “Bola Ahmed Tinubu Road” in Honor of President

Muhammad A. Aliyu
Muhammad A. Aliyu
June 6, 2025
L-R: Ify Okoye, Digital Creator; Linda Ejiofor-Suleiman, Actress; Stella Erebor, Head Internal Audit, Nigerian Communications Commission; Emanuella Samuel, Comedienne/Actress, Sylvia Musalagani, Safety Policy Manager, Africa, Middle East & Turkey (AMET), Meta, and Nicole Chikwe, founder of The Mummy Summit, during the launch of Instagram teen accounts in Lagos on Wednesday, June 4, 2025
Tech

Meta Launches Teen Accounts on Instagram in Nigeria to Enhance Online Safety for Young Users

Farouk Mohammed
Farouk Mohammed
June 6, 2025
Okay.ngOkay.ng
Follow US
© OKN MEDIA PUBLISHING 2025 - All rights reserved
  • About Okay.ng
  • Advertising on Okay.ng
  • Contact Okay.ng
  • Careers
  • Meet the Team behind Okay.ng
  • Ownership and Funding of Okay.ng
  • Editorial Principles at Okay.ng
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?